Stuart’s two-staged install

Stuart first got in touch with us back in 2021. He already had an EV charge point and wanted to get the full package for his home. He decided it was time for solar and a battery, so he could generate power and save any excess for when the house needed it.

A waiting game

Due to Tesla Powerwall supply timescales over the last year, we’ve often had to be flexible and take a different approach, splitting installations into two stages… installing solar panels and Powerwall’s separately, depending on kit availability. That’s exactly what happened with Stuart’s project.

Panels first, then Powerwall joins the party!

We installed the solar panels first, earlier this year, so that Stuart could instantly have the benefit of onsite generation without having to wait for the Powerwall. We stripped all the tiles back and installed 20 Sunpower 400 Wp panels, the aesthetically pleasing GSE in-roof mounting system, and an 8.2 kW Fronius inverter.

At the same time, we installed the Tesla Gateway – the control unit for the Powerwall, which helps it disconnect from the grid in a power cut. The Gateway would have to wait a short while to be joined by its partner in power storage, but after six months it was time for the Powerwall battery to take its rightful place!

A happy ending

Some installs are simple. Some have challenges along the way. In Stuart’s case stock was the challenge, but with patience and understanding on Stuart’s side and a flexible approach on ours, we have a very happy customer with a full set of kit, generating and storing clean energy for use exactly when the family needs it.

Discover more

Learn about solar panels for your home and how we choose them

How does a home battery work? Read our explanation

Why’s the Powerwall so popular? Head here to find out

Date

October 17, 2022

Category

Batteries and smart grids, Oxford, Residential, Solar